ϟFlexStor ENERGYTrade LabPrivate workspace
CROSS-BORDER ELECTRICITY

Albania → Europe

Compare trade corridors. Find the margin after delivery.

i

Assumption-based simulator. All prices, fees, losses and capacity limits are editable examples. Route connectivity does not imply available capacity or permission to trade.

EUR

Route comparison

Select a corridor to inspect its economics.

Route comparison with editable prices, transmission fees and losses
Destination / corridorSell
€/delivered MWh
Transmission
€/purchased MWh
Loss
% total
Gross
€ / trade
Net
€ / trade

Transmission is the sum of assumed corridor charges. Losses are applied once to purchased energy.

Gross vs. net margin

All corridors · € per trade

GrossNet

Sell-price sensitivity

Selected route assumptions

Capacity is a manual limit, not a live allocation.

Selected trade calculation breakdown
Selected trade breakdownEnergy / price€ / trade

Scenario comparison

Apply the same changes to every corridor.

Net margin · € / trade
Scenario assumptions and net margins by corridor
AssumptionDownsideBaseUpside

Price changes are €/MWh. Loss changes are percentage points. The fee multiplier applies to all market, transmission, fixed and other costs. Each scenario uses its own delivered energy.

Calculation method & corridor references +

Volume & losses

Purchased MWh = MW × delivery hours, or the total MWh entered. Average source MW = purchased MWh ÷ hours. Delivered MWh = purchased MWh × (1 − total loss % ÷ 100). For several legs, enter total loss as 1 − ∏(1 − leg loss).

Margins & break-even

Purchase cost = purchased MWh × buy price. Revenue = delivered MWh × sell price. Gross margin = revenue − purchase cost. Net margin = gross margin − transmission − buy fee − sell fee − fixed costs − other costs.

Break-even sell price = (purchase cost + transmission + buy fee + fixed costs + other costs) ÷ delivered MWh + sell market fee. Net €/MWh uses purchased energy. Calculations use full precision; displays are rounded.

Scope of this estimate

A single constant-volume delivery block, with flat prices and aggregate losses. It does not calculate hourly shaping, congestion, tax, FX, collateral, financing or imbalance settlement. Include known costs in the editable fees and other-cost fields. No order is placed.

Corridor references

Example corridors follow the physical links described by OST (Albania–Greece and Albania–Montenegro), Terna (Montenegro–Italy) and IPTO (Greece–Bulgaria). Checked 3 October 2026. They are planning corridors; cross-border rights and commercial arrangements require separate confirmation.